Choreography / Traceability

Kind: tension

Record: tension:choreography-traceability

Canonical: Schema

"choreography" (execution-core layer) is traded against "Traceability" (observability layer) — a principle cannot be scope-separated from a quality, metric, or cost it competes with; resolve by measuring "Traceability" and choosing an explicit operating point.

Listed in Tensions, after Consensus / Availability and before Determinism / Runtime Adaptivity.

In tension with

Mechanism

Linked from