# Chaos Engineering / Production Risk

> "chaos-engineering" (correctness-core layer) is traded against "Production Risk" (correctness-core layer) — a principle cannot be scope-separated from a quality, metric, or cost it competes with; resolve by measuring "Production Risk" and choosing an explicit operating point.

Record: `tension:chaos-engineering-production-risk`
Kind: tension
Canonical: https://banes-lab.com/ontology/schema#tension-chaos-engineering-production-risk

## tensions-with

- [Chaos Engineering](https://banes-lab.com/records/arch/chaos-engineering.md)
- [Production Risk](https://banes-lab.com/records/lex/production-risk.md)
