Chaos Engineering / Production Risk

Kind: tension

Record: tension:chaos-engineering-production-risk

Canonical: Schema

"chaos-engineering" (correctness-core layer) is traded against "Production Risk" (correctness-core layer) — a principle cannot be scope-separated from a quality, metric, or cost it competes with; resolve by measuring "Production Risk" and choosing an explicit operating point.

Listed in Tensions, after Canary Deployment / Rollout Complexity and before Graceful Shutdown / Shutdown Latency.

In tension with

Mechanism

Linked from