Admissibility Constraint Gate

Kind: algorithm

Record: algorithms:admissibility-constraint-stage

Canonical: Algorithms

Closure: Dependencies in load order

Gate the formalized plan on teleological admissibility before verification: sum the realized cost, compare it to the selected branch's budget and hard limits, and confirm every task traces to the selected branch — an over-budget, limit-breaching, or off-branch plan is inadmissible and routes back rather than being silently accepted.

Listed in Algorithm contracts, after Hierarchical Numbering and before Validation Stage.

Domain

Stage

Axis

Tier

Composed by

Named in the derivation of

Math type

Force

Linked from